Key Details

Project: 

RFID Toll Plaza reinforcement

Location:

Maine, USA

Client: 

Maine Transport Authority

Consultant:

HNTB Corporation

 

The Maine Turnpike Authority toll plaza conversion project in Maine involved removal of the slow speed lanes to make way for a higher speed system with EZPass-only lanes. This was to increase traffic flow safely in the area, even in wet and icy conditions.

Electrically neutral reinforcement was necessary for the RFID Toll Plaza so there would be no interference to the radio-frequency identification (RFID) transponders. Mateenbar™ provided electrically neutral reinforcement with all the advantages Mateenbar™ delivers including:

  • zero impact from concrete spalling
  • a long design life cycle
  • zero maintenance which would otherwise lead to traffic delays and economic costs.

This was all part of the upgrade which consisted of highway, bridge and toll system improvements.